For studios and partnersTwo files

Delivery case studies

Practical production examples from our South Wales team, focused on shipping complex systems with a lean studio footprint.

Production case study

Main Event: Wrestling Manager pipeline

For Main Event, we built a weekly simulation pipeline connecting booking logic, talent progression, and narrative state into a predictable production workflow. The output was a feature set that could scale without frequent regression and with consistent live feedback loops from the community.

  • Deterministic systems-first architecture for match outcomes and progression
  • Data-led balancing loop with rapid tuning cycles
  • Community-informed prioritization tied to release milestones
Technical deep dive

Complex UI for simulation data

We designed dense management interfaces to keep large datasets understandable while preserving speed and clarity. This included component-level consistency, constrained interaction patterns, and performance-aware rendering for roster and booking workflows.

  • Reusable component systems for rapid feature rollout
  • UX patterns tuned for high-frequency operational actions
  • Animation and state transitions designed for readability over novelty

Need similar delivery support

We partner with studios needing a reliable, systems-focused delivery team across prototyping, simulation logic, and product-ready UX.